安裝雙組份打膠機(jī)的嚴(yán)謹(jǐn)性和事宜
時(shí)間:2017-10-23 來(lái)源:http://intelyalan.cn/ 發(fā)布人:昌盛機(jī)械
1、雙組份打膠機(jī)設(shè)備應(yīng)安裝在干燥、無(wú)粉塵、無(wú)腐蝕性氣體的壞境中(該要求與其他設(shè)備一致,當(dāng)然如果條件達(dá)不到至少爭(zhēng)取無(wú)腐蝕性氣體,畢竟設(shè)備中有電線以及管路這些配件抗腐蝕性不高)。
1, two-component glue machine equipment should be installed in a dry, no dust, no corrosive gas environment (the requirements, and other equipment of course if the condition is not up to at least for non corrosive gas, after all equipment of electric wires and pipeline corrosion resistance of these parts is not high).
2、室內(nèi)溫度好控制在10~40度的室內(nèi)堅(jiān)硬地面上,地面應(yīng)水平度要好。(小編這里說(shuō)的地面水平度要好不一定要非常的平整才行,我們的設(shè)備在設(shè)計(jì)之初已經(jīng)考慮到了地面復(fù)雜性的因素所以對(duì)地面平整度是有相當(dāng)大的忍讓度的,只要不是幅度提別的大一般都可以正常工作。)
2, indoor temperature is best controlled in 10~40 degrees indoor hard ground, ground level should be better. (Tracy said here is to ground level must be very smooth for our equipment at the beginning of the design has taken into account the complexity of ground factors so the ground roughness is a considerable degree of patience, as long as not to mention anything else large amplitude can generally be normal work.)
3、雙組份打膠機(jī)安裝之前,應(yīng)先檢查是否有因運(yùn)輸、搬動(dòng)造成的變形、損壞和緊固件松動(dòng)情況,之前就曾經(jīng)有客戶在移動(dòng)打膠機(jī)的過(guò)程中把設(shè)備的智能控制系統(tǒng)的一個(gè)零部件碰掉了而導(dǎo)致設(shè)備無(wú)法正常運(yùn)行,我們的工作人員到現(xiàn)場(chǎng)后才排查出的原因。
3, a two-component glue machine before installation, should check whether there is for transportation, moving caused by deformation and damage and loose fasteners, before once had the process of customer atx-ii in mobile in a part of intelligent control system of equipment off and leads to the normal operation of equipment, the reason for our staff to the scene after the investigation of the.
4、我們可以根據(jù)地面平整度的實(shí)際情況來(lái)通過(guò)調(diào)整設(shè)備的可升降地腳螺栓來(lái)調(diào)整設(shè)備的水平度直到設(shè)備水平而穩(wěn)固。然后按圖接線并可靠接地,把氣源接入機(jī)器所配帶的氣源接口,確保無(wú)漏氣現(xiàn)象。
4, first of all, we can adjust the level of the equipment to the level and stability of the equipment according to the actual situation of the ground roughness by adjusting the lifting anchor bolt of the equipment. Then, the wiring is connected to the diagram and reliably grounded, and the gas source is connected to the air source interface which is equipped with the machine to ensure no leakage.
5、向油槽中加注液壓油至指定位置,46#液壓油(約為50升左右)。
5. Fill the oil tank with hydraulic oil to the specified position, 46# hydraulic oil (about 50 liters).
6、接通電源并打開(kāi)查看設(shè)備是否能夠正常運(yùn)行。
6. Turn on the power and turn on to see if the device is functioning properly.
本文的精彩內(nèi)容來(lái)自雙組份打膠機(jī)詳細(xì)內(nèi)容請(qǐng)點(diǎn)擊我們的官方網(wǎng)站:http://intelyalan.cn謝謝您的到來(lái)!
The wonderful content of this article comes from the two component dispenser, please click on our official website: http://intelyalan.cn, thank you for coming!
- 中空玻璃全自動(dòng)封膠線一天能做多少平方 2024/12/28
- 中空玻璃生產(chǎn)線一天能做多少平方 2024/12/23
- 全自動(dòng)丁基膠涂布機(jī)操作規(guī)程 2024/12/14
- 丁基膠涂布機(jī)在使用的常見(jiàn)問(wèn)題 2024/12/13
- 雙組份打膠機(jī)如何調(diào)整滴膠量? 2024/12/09
- 中空玻璃生產(chǎn)線的磨損如何解決 2024/12/07
- 雙組份打膠機(jī)對(duì)于打膠工作完成很重要 2024/12/05
- 全自動(dòng)封膠線的工業(yè)自動(dòng)化設(shè)備介紹 2024/12/03
- 玻璃涂布機(jī)設(shè)備:設(shè)備存在的安全隱患 2024/11/25
- 中空玻璃加工設(shè)備:玻璃開(kāi)膠的應(yīng)急處理措施 2024/11/21
產(chǎn)品分類(lèi)Product categories
聯(lián)系我們Contact us
- 咨詢熱線:0531-85717458 13705446998
- 公司地址: 山東省德州市齊河安頭鄉(xiāng)企巢工業(yè)園
- 掃碼聯(lián)系我們: