雙組份打膠機(jī)的安裝要注意什么?
時(shí)間:2023-02-28 來源:http://intelyalan.cn/ 發(fā)布人:昌盛機(jī)械
1、雙組份打膠機(jī)設(shè)備應(yīng)安裝在干燥、無粉塵、無腐蝕性氣體的壞境中(該要求與其他設(shè)備一致,當(dāng)然如果條件達(dá)不到至少爭取無腐蝕性氣體,畢竟設(shè)備中有電線以及管路這些配件抗腐蝕性不高)。
1. The two-component sealant applicator equipment should be installed in a dry, dust-free and non-corrosive environment (this requirement is the same as other equipment, of course, if the conditions are not met, at least strive for non-corrosive gas, after all, there are wires and pipelines in the equipment, which are not highly resistant to corrosion).
2、室內(nèi)溫度控制在10~40度的室內(nèi)堅(jiān)硬地面上,地面應(yīng)水平度要好。(小編這里說的地面水平度要好不一定要非常的平整才行,我們的設(shè)備在設(shè)計(jì)之初已經(jīng)考慮到了地面復(fù)雜性的因素所以對(duì)地面平整度是有相當(dāng)大的忍讓度的,只要不是幅度提別的大一般都可以正常工作。)
2. The indoor temperature shall be controlled on the indoor hard ground of 10~40 degrees, and the ground shall be level. (The ground levelness mentioned by the editor here needs to be very smooth. Our equipment has taken into account the complexity of the ground at the beginning of design, so it has a great tolerance for the ground levelness. It can normally work as long as it is not significantly improved.)
3、雙組份打膠機(jī)安裝之前,應(yīng)先檢查是否有因運(yùn)輸、搬動(dòng)造成的變形、損壞和緊固件松動(dòng)情況,之前就曾經(jīng)有客戶在移動(dòng)打膠機(jī)的過程中把設(shè)備的智能控制系統(tǒng)的一個(gè)零部件碰掉了而導(dǎo)致設(shè)備無法正常運(yùn)行,我們的工作人員到現(xiàn)場后才排查出的原因。
3. Before installing the two-component sealant applicator, it is necessary to check whether there is deformation, damage and loosening of fasteners caused by transportation and moving. Previously, a customer knocked off a part of the intelligent control system of the equipment in the process of moving the sealant applicator, which caused the equipment to fail to operate normally. Our staff only found out the reason after arriving at the site.
4、我們可以根據(jù)地面平整度的實(shí)際情況來通過調(diào)整設(shè)備的可升降地腳螺栓來調(diào)整設(shè)備的水平度直到設(shè)備水平而穩(wěn)固。然后按圖接線并可靠接地,把氣源接入機(jī)器所配帶的氣源接口,確保無漏氣現(xiàn)象。
4. First, we can adjust the levelness of the equipment by adjusting the lifting anchor bolts of the equipment according to the actual situation of the ground levelness until the equipment is horizontal and stable. Then connect the wires according to the drawing and reliably connect the air source to the air source interface of the machine to ensure that there is no air leakage.
5、向油槽中加注液壓油至指定位置,46#液壓油(約為50升左右)。
5. Fill the oil tank with hydraulic oil to the specified position, 46 # hydraulic oil (about 50 liters).
6、接通電源并打開查看設(shè)備是否能夠正常運(yùn)行。
6. Turn on the power and turn it on to check whether the device can operate normally.
本文由雙組份打膠機(jī)提供技術(shù)支持,更多的詳細(xì)精彩內(nèi)容請點(diǎn)擊我們的網(wǎng)站 http://intelyalan.cn我們將會(huì)全心全意為您提供滿意的服務(wù)。
This article is supported by the two-component gluing machine. For more details, please click our website http://intelyalan.cn We will wholeheartedly provide you with satisfactory service.
相關(guān)新聞 moer+
- 中空玻璃全自動(dòng)封膠線的優(yōu)缺點(diǎn)是什么 2025/01/07
- 雙組份打膠機(jī)出花膠怎樣處理 2025/01/04
- 中空玻璃全自動(dòng)封膠線一天能做多少平方 2024/12/28
- 中空玻璃生產(chǎn)線一天能做多少平方 2024/12/23
- 全自動(dòng)丁基膠涂布機(jī)操作規(guī)程 2024/12/14
- 丁基膠涂布機(jī)在使用的常見問題 2024/12/13
- 雙組份打膠機(jī)如何調(diào)整滴膠量? 2024/12/09
- 中空玻璃生產(chǎn)線的磨損如何解決 2024/12/07
- 雙組份打膠機(jī)對(duì)于打膠工作完成很重要 2024/12/05
- 全自動(dòng)封膠線的工業(yè)自動(dòng)化設(shè)備介紹 2024/12/03
相關(guān)產(chǎn)品 moer+
產(chǎn)品分類Product categories
聯(lián)系我們Contact us
- 咨詢熱線:0531-85717458 13705446998
- 公司地址: 山東省德州市齊河安頭鄉(xiāng)企巢工業(yè)園
- 掃碼聯(lián)系我們: